Bored in class tonight...here's what I could think of/remember and wrote down:
Install drier vent
put up hardibackin in the east bathroom for tiling
tile east bathroom
fix roof leak in attic closet
fix roof leak (discovered during last night's torrents) above master bathroom
tile Chance's bathroom shower surround
tile basement floor
tile laundry room floor
trim around downstairs doors and floors
trim around west entry and landing
exterior trim - install and paint
paint central stairwell
replace livingroom window panes
install/fix cabinets above microhood
insulate venting ductwork
reupholster inherited chairs
refinish inherited table
call electrician: fix west dining room and laundry room lights
master bath needs shower door
master bath needs priming/painting
resurface/replace (?) master bath vanity - optional
replace kitchen window trim/moulding
get new kitchen faucet and install insta-hot
paint touch up in laudry room (upstairs)
fix leak in hoses in upstairs laundry room
install sheetrock in e bathroom cubby closet
rat trap for attic closet
clothesrack for master closet
install shelving and doors for pantry
oh...and, finish kitchen remodel -- maybe the squak mountain stone stuff? talk about nifty!
If you're one of my friends...I apologize. But, seriously...think I can get it done in time for Thanksgiving?
haha
Tuesday, November 4, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment